WASTEWATER COLLECTOR OF LAS PALMAS G.C.

Category
Hydraulic Works
About This Project

PROJECT OF WASTEWATER COLLECTOR OF LAS PALMAS G.C. (PHASES 1 AND 2)

CLIENT: Consejo Insular de Aguas de Gran Canaria

DATE OF COMPLETION : 2002

DESCRIPTION: The contracted works consist of project a new collector that allow the capture and gravity-driven wastewater of the upper area of the city of Las Palmas de Gran Canaria (Spain), optimizing the energy operation of the sanitation system by lowering the volume of wastewater driven with pumping stations. Budget € 30.729.504,33.