LA ESFINGE JETTY. SECOND PHASE

Category
Ports and Maritime Engineering
About This Project

LA ESFINGE JETTY. SECOND PHASE

CLIENT: Port Authority of Las Palmas

DATE OF COMPLETION: 2009

DESCRIPTION:  The aim of the work was to provide technical assitance for the  control and management of the construction of the second phase of the La Esfinge jetty in the Port of Las Palmas, Spain. This jetty is composed of a first N-SE alignment in a length of 301,92 meters with sloping dike type and by a second N-S alignment, with a length of 664,47 meters, with a vertical dike type. The sloping dike has a main mantle of concrete blocks of 56 t. The vertical jetty is composed of 15 floating concrete caissons of reinforced concrete. Budget € 49.513.002,80.