OPTIMISATION STUDY OF THE WATER SUPPLY SYSTEM IN THE EAST SECTOR OF GRAN CANARIA

Category
Hydraulic Works
About This Project

OPTIMISATION STUDY OF THE WATER SUPPLY SYSTEM IN THE EAST SECTOR OF GRAN CANARIA

CLIENT: Gobierno de Canarias

DATE OF COMPLETION: 1998

DESCRIPTION: The contracted works consist of a study aimed at optimizing the systems for the supply and distribution of potable water and treated wastewater from the eastern sector of the island of Gran Canaria (Spain), through the interconnection of the pre-existing networks for the transfer of water between basins. Budget € 19.681.207,87.